![]() ![]() Ensure that the switch has a route to the remote server. Power interruptions can corrupt the software image.Ĭonfigure the IPv4 address or IPv6 address for the 10/100/1000 BASE-T Ethernet port connection (interface mgmt0). Hardware-Avoid power interruptions during an installation procedure.The internal bootflash requires approximately 200 MB of free space. Space-Verify that sufficient space is available in the location where you are copying the images.You cannot configure a switch during an upgrade. Ensure that everyone who has access to the switch or the network is not configuring the switch or the network during this time. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |